Case Study Details

Location : Edinburgh

Date : April 2025

Details : Daikin VRV IV with Hot Water Generation - 65 no. AC Indoor Units Supply Install - Bedrooms & Public Area

8 January 2025 – 3 April 2025

Prime Air AC successfully completed a major Daikin UK VRV IV installation at the Marriott Bonvoy Four Points by Sheraton Hotel in Edinburgh.

The project comprised 65 concealed indoor air-conditioning units, together with hydroboxes and hot-water cylinders, providing an integrated solution for heating, cooling and domestic hot water.

One of the main challenges was completing the installation while the hotel remained fully operational. Through careful planning and close coordination with the hotel’s management team, the project was delivered safely and efficiently within approximately 12 weeks, with minimal disruption to guests and daily operations.

The new energy-efficient Daikin system replaced the hotel’s existing fossil-fuel heating equipment, delivering improved climate control, greater guest comfort and a more sustainable solution aligned with the hotel’s long-term environmental objectives.

Project highlights

  • Daikin VRV IV heating and cooling system
  • 65 concealed indoor air-conditioning units
  • Daikin hydroboxes and hot-water cylinders
  • ITouch centralised controller
  • Replacement of the existing fossil-fuel heating system
  • Installation completed within a fully operational hotel
  • Project delivered in approximately 12 weeks
  • Improved energy efficiency and guest comfort

 

Contact Us Today

Our team is ready and waiting to help you. Contact us today to book in your free survey and quote. Call us on 020 3941 9494 or click below to fill in your details and arrange a call back.

 Contact Us Today

Our Case Studies

Our work speaks for itself. Take a look at how we've helped businesses like yours achieve their goals through thoughtful design and smart development.

Accreditation

8 January 2025 – 3 April 2025

Prime Air AC successfully completed a major Daikin UK VRV IV installation at the Marriott Bonvoy Four Points by Sheraton Hotel in Edinburgh.

The project comprised 65 concealed indoor air-conditioning units, together with hydroboxes and hot-water cylinders, providing an integrated solution for heating, cooling and domestic hot water.

One of the main challenges was completing the installation while the hotel remained fully operational. Through careful planning and close coordination with the hotel’s management team, the project was delivered safely and efficiently within approximately 12 weeks, with minimal disruption to guests and daily operations.

The new energy-efficient Daikin system replaced the hotel’s existing fossil-fuel heating equipment, delivering improved climate control, greater guest comfort and a more sustainable solution aligned with the hotel’s long-term environmental objectives.

Project highlights

 

Start A project

Get In Touch

8 January 2025 – 3 April 2025

Prime Air AC successfully completed a major Daikin UK VRV IV installation at the Marriott Bonvoy Four Points by Sheraton Hotel in Edinburgh.

The project comprised 65 concealed indoor air-conditioning units, together with hydroboxes and hot-water cylinders, providing an integrated solution for heating, cooling and domestic hot water.

One of the main challenges was completing the installation while the hotel remained fully operational. Through careful planning and close coordination with the hotel’s management team, the project was delivered safely and efficiently within approximately 12 weeks, with minimal disruption to guests and daily operations.

The new energy-efficient Daikin system replaced the hotel’s existing fossil-fuel heating equipment, delivering improved climate control, greater guest comfort and a more sustainable solution aligned with the hotel’s long-term environmental objectives.

Project highlights

  • Daikin VRV IV heating and cooling system
  • 65 concealed indoor air-conditioning units
  • Daikin hydroboxes and hot-water cylinders
  • ITouch centralised controller
  • Replacement of the existing fossil-fuel heating system
  • Installation completed within a fully operational hotel
  • Project delivered in approximately 12 weeks
  • Improved energy efficiency and guest comfort

 